Wastewater Treatment System for 2000-head Pig Farm

by endalton 25 Mar 2025

Wastewater Treatment System for 2000-head Pig Farm 

Based on the actual scale of a 2000-head pig farm (producing about 20 tons of sewage daily), design a wastewater treatment system and cost details to meet the requirements of the "Emission Standards of Pollutants for Livestock and Poultry Breeding Industry" (GB18596-2001).

1. Water Quantity and Quality Parameters

  • Sewage Volume: 20 tons/day (calculated at 10kg per head per day for 2000 pigs)
  • Influent Water Quality (based on historical data from similar pig farming wastewater cases):
    • COD: 8000-12,000mg/L
    • NH₃N: 800-1200mg/L
    • TP: 200-300mg/L
    • SS: 2000-4000mg/L
  • Effluent Target:
    • Preliminary Plan: Meet GB18596-2001 standard (COD≤400mg/L, NH₃N≤80mg/L, TP≤8mg/L)

2. Process Flow Optimization (20 tons/day scale)

"Solid-Liquid Separation + High-Efficiency Anaerobic + Integrated A/O MBR + Constructed Wetland"
A[Raw Water]>B(Solid-Liquid Separator) B>C(Regulation Tank) C>D(EGSB Anaerobic Reactor) D>E(Integrated MBR Equipment) E>F(Constructed Wetland) F>G[Effluent Meeting Standards]

Key Process Description

  • Solid-Liquid Separator: Sieve mesh aperture 0.5mm, removes fibrous suspended solids (reducing subsequent membrane fouling risk)
  • EGSB Anaerobic Reactor: Volumetric load 6-8kg COD/(m³·d), retention time 3-5 days, COD removal rate≥85%
  • Integrated MBR Equipment: Integrated anoxic + aerobic + membrane pool, membrane flux 15L/(m²·h), membrane area≥30m²
  • Constructed Wetland: Area 50m², planted with reeds, further nitrogen and phosphorus removal

3. Itemized Cost Details (unit: ten thousand yuan)

Category Sub-Item Name Specifications/Parameters Quantity Unit Price/(ten thousand yuan) Subtotal/(ten thousand yuan)
Pretreatment Solid-liquid separator Treatment capacity 2m³/h, stainless steel 1 unit 3.5 3.5
Anaerobic Unit EGSB reactor Φ2.5m×6m, PE material 1 set 12 12
MBR System Integrated equipment (with membrane components) Treatment capacity 1m³/h, PLC control 1 set 28 28
Ecological Treatment Constructed wetland 50m², with fillers + plants 1 item 2.5 2.5
Other Costs Installation and commissioning fee - - - 5
Total - - - - 51 ten thousand yuan

4. Operation Cost Analysis (calculated at 20 tons/day)

Item Unit Price Daily Consumption Daily Cost/(yuan) Annual Cost/(ten thousand yuan)
Electricity Cost 0.65 yuan/kWh 60kWh 39 1.42
Chemical Cost PAC: 2000 yuan/ton 5kg 10 0.36
Membrane Replacement 300 yuan/m² (5-year lifespan) Annual replacement 6m² - 0.18
Labor Cost 5000 yuan/person·month - 83 3
Total - - 132 yuan/day 4.96 ten thousand yuan/year

5. Key Design Parameter Verification

  • EGSB Anaerobic Reactor:
    • Effective Volume: 25m³ (20 tons/day × 1.25-day retention time)
    • Biogas Production: 20 tons/day × COD removal 8000mg/L × 0.35m³/kg = 56m³/day
    • Usage: Can be used as fuel for farm kitchen (equivalent to saving 15kg liquefied gas daily)
  • MBR System:
    • Membrane Area Requirement: 20 tons/day ÷ 24h ÷ 15L/(m²·h) = 56m² (actual selection 30m², meeting demand by extending operation time)
    • Sludge Concentration (MLSS): 8000-12,000mg/L

6. Investment Return and Resource Utilization

  • Direct Benefits:
    • Biogas Utilization: 56m³/day × 0.5 yuan/m³ = 28 yuan/day → Annual revenue 1.02 ten thousand yuan
    • Organic Fertilizer Production: Annual production of 10 tons of dewatered sludge, sold at 800 yuan/ton → Annual revenue 0.8 ten thousand yuan
  • Indirect Benefits:
    • Exemption from Discharge Fees (about 0.8 yuan/ton according to local standards) → Annual saving 0.58 ten thousand yuan
    • Reclaimed Water Replacing Groundwater (20 tons/day × 0.5 yuan/ton) → Annual saving 0.36 ten thousand yuan
  • Comprehensive Payback Period: Total revenue: 1.02 + 0.8 + 0.58 + 0.36 = 2.76 ten thousand yuan/year; Net operating cost: 4.96 - 2.76 = 2.2 ten thousand yuan/year

7. Implementation Suggestions

  • Equipment Selection: Prioritize integrated MBR equipment (such as "Membrane Bioreactor for Rural Livestock Wastewater") to reduce civil engineering work.
  • Operation and Maintenance Management:
    • Daily check the screen clogging of the solid-liquid separator
    • Monthly monitor the membrane flux of MBR, and perform chemical cleaning (sodium hypochlorite + citric acid) in time
  • Expandable Design: Reserve 20% land for future expansion to 50 tons/day.
This is an initial plan. The scheme uses "compact anaerobic + integrated MBR" to achieve low investment (500,000 yuan level) and low operation & maintenance (within 50,000 yuan/year), suitable for farms with around 2000 pigs. Actual construction should be preceded by water quality testing and process combination adjustment according to site conditions.
Prev Post
Next Post

Thanks for subscribing!

This email has been registered!

Shop the look

Choose Options

Edit Option

Choose Options

this is just a warning
Shopping Cart
0 items